I have created and run SSIS packages from my workstation that are successful. When I Build and then Deploy the same package to the server and schedule it, it fails. I am using SQL authentication connecting from a SQL 2000 database to a SQL 2005 database via OLE DB connections.
The following is the exported result of the package...
05/09/2007 15:46:05,AMS_EnterpriseWarehouse,Error,0,AMSBINT1,AMS_EnterpriseWarehouse,(Job outcome),,The job failed. The Job was invoked by User JDEREP. The last step to run was step 1 (step1).,00:00:01,0,0,,,,0
05/09/2007 15:46:05,AMS_EnterpriseWarehouse,Error,1,AMSBINT1,AMS_EnterpriseWarehouse,step1,,Executed as user: AMSOILvector. Error: 2007-05-09 15:46:06.38 Code: 0xC0047017 Source: JDE Production to AMS BI 7332 DTS.Pipeline Description: component "F0005" (1) failed validation and returned error code 0xC020801C. End Error Error: 2007-05-09 15:46:06.38 Code: 0xC004700C Source: JDE Production to AMS BI 7332 DTS.Pipeline Description: One or more component failed validation. End Error Error: 2007-05-09 15:46:06.38 Code: 0xC0024107 Source: JDE Production to AMS BI 7332 Description: There were errors during task validation. End Error DTExec: The package execution returned DTSER_FAILURE (1). Started: 3:46:05 PM Finished: 3:46:06 PM Elapsed: 0.75 seconds. The package execution failed. The step failed.,00:00:01,0,0,,,,0 05/09/2007 15:30:00,AMS_EnterpriseWarehouse,Error,0,AMSBINT1,AMS_EnterpriseWarehouse,(Job outcome),,The job failed. The Job was invoked by Schedule 29 (AMS_EnterpriseWarehouse). The last step to run was step 1 (step1).,00:00:01,0,0,,,,0 05/09/2007 15:30:00,AMS_EnterpriseWarehouse,Error,1,AMSBINT1,AMS_EnterpriseWarehouse,step1,,Executed as user: AMSOILvector. Error: 2007-05-09 15:30:01.15 Code: 0xC0047017 Source: JDE Production to AMS BI 7332 DTS.Pipeline Description: component "F0005" (1) failed validation and returned error code 0xC020801C. End Error Error: 2007-05-09 15:30:01.15 Code: 0xC004700C Source: JDE Production to AMS BI 7332 DTS.Pipeline Description: One or more component failed validation. End Error Error: 2007-05-09 15:30:01.15 Code: 0xC0024107 Source: JDE Production to AMS BI 7332 Description: There were errors during task validation. End Error DTExec: The package execution returned DTSER_FAILURE (1). Started: 3:30:00 PM Finished: 3:30:01 PM Elapsed: 0.734 seconds. The package execution failed. The step failed.,00:00:01,0,0,,,,0 05/09/2007 15:20:00,AMS_EnterpriseWarehouse,Error,0,AMSBINT1,AMS_EnterpriseWarehouse,(Job outcome),,The job failed. The Job was invoked by Schedule 29 (AMS_EnterpriseWarehouse). The last step to run was step 1 (step1).,00:00:01,0,0,,,,0 05/09/2007 15:20:00,AMS_EnterpriseWarehouse,Error,1,AMSBINT1,AMS_EnterpriseWarehouse,step1,,Executed as user: AMSOILvector. Error: 2007-05-09 15:20:01.55 Code: 0xC0047017 Source: JDE Production to AMS BI 7332 DTS.Pipeline Description: component "F0005" (1) failed validation and returned error code 0xC020801C. End Error Error: 2007-05-09 15:20:01.55 Code: 0xC004700C Source: JDE Production to AMS BI 7332 DTS.Pipeline Description: One or more component failed validation. End Error Error: 2007-05-09 15:20:01.55 Code: 0xC0024107 Source: JDE Production to AMS BI 7332 Description: There were errors during task validation. End Error DTExec: The package execution returned DTSER_FAILURE (1). Started: 3:20:00 PM Finished: 3:20:01 PM Elapsed: 0.703 seconds. The package execution failed. The step failed.,00:00:01,0,0,,,,0 05/09/2007 15:18:00,AMS_EnterpriseWarehouse,Error,0,AMSBINT1,AMS_EnterpriseWarehouse,(Job outcome),,The job failed. The Job was invoked by Schedule 29 (AMS_EnterpriseWarehouse). The last step to run was step 1 (step1).,00:00:01,0,0,,,,0 05/09/2007 15:18:00,AMS_EnterpriseWarehouse,Error,1,AMSBINT1,AMS_EnterpriseWarehouse,step1,,Executed as user: AMSOILvector. Error: 2007-05-09 15:18:01.53 Code: 0xC0047017 Source: JDE Production to AMS BI 7332 DTS.Pipeline Description: component "F0005" (1) failed validation and returned error code 0xC020801C. End Error Error: 2007-05-09 15:18:01.53 Code: 0xC004700C Source: JDE Production to AMS BI 7332 DTS.Pipeline Description: One or more component failed validation. End Error Error: 2007-05-09 15:18:01.53 Code: 0xC0024107 Source: JDE Production to AMS BI 7332 Description: There were errors during task validation. End Error DTExec: The package execution returned DTSER_FAILURE (1). Started: 3:18:00 PM Finished: 3:18:01 PM Elapsed: 0.766 seconds. The package execution failed. The step failed.,00:00:01,0,0,,,,0
Any help would be greatly appreciated...
Jim
Additionally, when I run this from the command line, I get the following
I'm currently using Windows Task Scheduler to run a few jobs. We would like to start using the SQL Server Agent to handle this. The problem I am having is in specifing the 'working directory' of the program. The program is generating some files in a temp directory withing the root of the application. For some reason when I schedule in SQL it is generating these files in the WinSys32 directory.
I am using the CmdExec type in my job step.
I am sure I may have left out some info. please let me know if you need anything else.
---------------------- MS Win XP Pro 2002 SP2 MS SQL Server 2005 MS Visual Studio 2005 ----------------------
Can anyone help me (even by pointing me to a documentation) in order to schedule Packages (from file system source) in SQL Server 2005.
I've configured providers logging, but still the error file doesn't give me any explanation why the error happens: "#Fields: event,computer,operator,source,sourceid,executionid,starttime,endtime,datacode,databytes,message OnPreValidate,PC1234,NT AUTHORITYSYSTEM,D_AGR,{8A4FA774-F5F0-40DE-AB16-A93F27950E09},{8A918844-8E43-403D-A606-C8CB4B7D8238},31/08/2006 16:42:55,31/08/2006 16:42:55,0,0x,(null)"
I've also done the same on the Step properties under 'Logging'
In Management Studio I've added my login name and I'm the only user using the machine and I manage both Visual Studio and Management Studio
The error coming up on the job history is as follow: "Executed as user: PC1234SYSTEM. The package execution failed. The step failed." "The job failed. The Job was invoked by User UK1USER123. The last step to run was step 1 (step1)."
By the way the package (.dtsx) runs fine in BI Visual Studio)
Regarding backups. The first available time to do a full backup is at 11:00pm which also applies to diff. backups. How often does the trans. logs need a back up?
I have set a job to run hourly between 8 am and 8 pm. I mark the schedule as enabled and mark the job as enabled. It will run for that day and then the enable check on the schedule clears out. I have several other jobs that run without this problem. Has anyone heard of this before and can this be effectively monitored?
Hi, Can anybody give me the steps to schedule Database backup and restores in 7.0? I can do the backup and restores of the database without scheduling. I dont know how to do with scheduling.
I've created a task which monitors the server, I want it to run every 30 sec. But the scheduler in job allows to run at the most only 1 min. Is it the way to make it 30 sec?
Can I use SQL Server Agent schedule to start my.exe? I am not sure in command that I have to place in "Edit Job Steps" DialogBox. It's not working just with path.
Hello all, I am trying to schedule DTS package. Seems like I have two options 1. Save DTS package as a File and Run it using dtsrun function 2. Save DTS package on server and use scheduling wizard
If I use method #1 it works fine but you have ti create job, schedule it and yada, yada, yada..... Method #2 seems mach more simple but then I use it it does nothind.
I'm having a little trouble getting a DTS package to run as a scheduled event. I have created the same one(an export to Access db on the same computer) as a local package and a repository package. Both will run normally when I start them manually from the DTS screen, but they will not run from the scheduler. It seems like this might be some kind of permissions problem, but it could easily be something else, since I've never used DTS before.
I created a DTS to transfer two tables from one server to another and set up a schedule to run once everyday. I could not get it to run. I got this warning message from evetlog: SQL Server Scheduled Job 'Forum' (0x0E0AA96BB9A1654C94AA12CC8B854BC8) - Status: Failed - Invoked on: 2/21/2001 4:00:00 PM - Message: The job failed. The Job was invoked by Schedule 1 (Forum). The last step to run was step 1 (Forum). But when I execute it manually, it run successfully.
I am using MS SQL 7.0 Your help is much appreciated.
i'm very new to sql server and stuff... so i'm lost here. i'm using the job scheduling wizard and i'm getting a couple of errors. first of all i need this vbscript to run weekly... do i need to translate it to tsql, or can i just paste this into the job scheduler thing?
----------------------------------------------------------- dim strSQL, oConn, objRS const adOpenDynamic = 2 const adLockOptimistic = 3 Set oConn = Server.CreateObject("ADODB.connection") Set objRS = Server.CreateObject("ADODB.Recordset") oConn = "my conn string with secure info you cant see :)" strSQL = "SELECT BattleRD FROM BattleList" objRS.Open strSQL, oConn, adOpenDynamic, adLockOptimistic objRS.MoveFirst While Not objRS.EOF objRS("BattleRD")=objRS("BattleRD") + 1 objRS.Update objRS.MoveNext Wend objRS.Close Set objRS = Nothing -----------------------------------------------------------
here are my errors in the job scheduler after selecting the dates...
I have two jobs scheduled on the Agent. Each job has ten steps. The next step is executed only if the previous suceeds.
I want Job 2 to execute only if Job 1 suceeds. How do I schedule that?
I was thinking that I can have the ten steps of Job 2 as steps (11 to 20) of Job 1 with each step executing after the previous one succeeds. If I do that then I can get rid of Job 2.
I am trying to schedule a simple job to run a stored procedure in my database. The stored procedure runs perfectly when I do so manually, however when I ask a job to run it, it gives me the following error:
Access to the remote server is denied because the current security context is not trusted [SQLSTATE 42000](Error 15274).
The stored procedure does create a linked server (to an ORACLE database) and executes some commands across it. I've tried doing the link server creation as a separate step in the job and it executes that just fine so it has no issues creating the server, it just dies when it tries to use it. The job owner is the same user I've been using the execute the procedure manually. I also run the procedure step as that same user. But I still have this problem. Someone please help me!!
Is it possible to input values to a sql job so that the sam ejob runs for different parameters i.ee the same job runs for X on all 7 days o a week and for Y only on all weekdays...
My boss wants to schedule a job that will run on the Wednesday night before the first Thursday of every month, recur on the first Thursday, and again on the Friday, Saturday, Sunday and Monday following the first Thursday of the month.
I've already got the first Thursday scheduled. Is there a way to schedule the other days. I haven't been able to find any documentation on how to do it, if it is possible. And I've looked at the sp_add_jobschedule to noavail.
Any help would be much appreciated. Even if it is telling me it can't be done.
I'm trying to create a subsciption for my report. In first creation I can do scheduling just fine, but when I try to edit my schedule, it's totally different. It shows value 1.1.0001 and when I try to change it, it's gives me first message: value of '1.1.0001 0:00:00' is not valid for 'Value'. 'Value' should be between 'MinDate' and 'MaxDate'. Parameter name: Value (System.Windows.Forms)
and after that when pushing OK it gives me message: "The required field StartDateTime is missing from the input structure. (rsMissingElement)".
Do you think it's a bug or is there something which I'm doing wrong?
I know enough about Databases to get myself in trouple. So maybe someone can point me in the right direction, or help me out. I work for the American Red Cross in Provo UT. We want to be able to put class registration on line so that someone can visit our website chose the class they want to take, register and pay for it all on-line. Our website http://www.redcrossut.org is hosted with godaddy and I am able to post a SQL Database. I know that our website as it stands is very poor. The people who have maintained it in the past have no idea what they were doing, my job is not the website, I am over Health & Safety Training, but have done some work with websites for fun in the past. I know a little about Visual Studio and plan to rebuild the site using C#. I can build a basic Database and interface to it with Visual Studio, Godaddy can help me with the payment part, but I have no idea how to set up SQL to allow scheduling. Any help would be appreciated. Even if it’s just a link to a tutorial.
Ed Hall Director Health & Safety Services Mountain Valley Chapter American Red Cross
I have a SQL Update Query that I want to run automatically everyday and I have read through the posts and I do not understand very clearly how to go about creating one.
The SQL query I want to run is this:
UPDATE Rental SET TotalFee = ExtraFee + TotalFee WHERE DaysOverdue >= 0
Once I have made a DTS package. How do I declare it in my coding???
We are using an MSDE database engine (1.0=sql7) as a report scheduler on a web server. I can access MSDE via SQL7 Enterprise Manager to connect and view MSDE, but cannot use the DTS and job scheduling as MSDE seems to lack needed components. Using Microsoft Knowledge Base article Q241397 as a guide, I was able to create a backup of the msdb database using stored procedures including sp_add_job, sp_add_jobserver,etc, that are already present in the msdb database.
My problem is that I need to create and schedule a job for another MSDE database called CE8. This database was created by the reporting app, and contains no stored procedures. It looks to me like only msdb has the needed job scheduling procs. Does this imply that I am supposed to schedule all jobs for all databases via msdb database, or will I need to copy all job scheduling stored procedures into the other CE8 database, then create a job? Hope this makes sense, Randy
Does anyone else ever have a problem getting scheduled DTS packages to run? I have a package that is replicating from an Access database. If I manually execute the DTS package, it works fine. If I try to schedule the same package, it bombs. Also what password do you use for the Owner and User when you are trying to schedule a SQL Server (not repository) DTS package? I've tried my loging password and it I still get problems.
I have created a DTS Package which collects data from DB2 and stores in a table on SQL Server v 7.0. The execution of the package works fine.
When I schedule the package by right-clicking and selecting SCHEDULE PACKAGE, I fill in the dialog box. When the package runs, I receive the following error: DTSRun: Loading... Error: -2147217390 (80041012); Provider Error: 0 (0) Error string: [Microsoft][ODBC SQL Server Driver][Named Pipes]ConnectionOpen (CreateFile()). Error source: Help file: Help context: 0. Process Exit Code 1. The step failed.
I get this same error when I run the package as a job. The package is in the repository. My run command looks like: DTSRun /S 111.11.11.11 /U sa /P xxxx /N DTS_Projections /R The package owner is sa.
I have a Dts Package that runs no problem but if I schedule it I get this Error: DTSRun: Loading... DTSRun: Executing... DTSRun OnStart: DTSStep_DTSExecuteSQLTask_1 DTSRun OnError: DTSStep_DTSExecuteSQLTask_1, Error = -2147217887 (80040E21) Error string: Multiple-step OLE DB operation generated errors. Check each OLE DB status value, if available. No work was done. Error source: Microsoft OLE DB Provider for SQL Server Help file: Help context: 0 Error Detail Records: Error: -2147217887 (80040E21); Provider Error: 0 (0) Error string: Multiple-step OLE DB operation generated errors. Check each OLE DB status value, if available. No work was done. Error source: Microsoft OLE DB Provider for SQL Server Help file: Help context: 0 DTSRun OnFinish: DTSStep_DTSExecuteSQLTask_1 DTSRun: Package execution complete. Process Exit Code 1. The step failed.
Did anyone run in to problems with the DTS scheduler function? IE. How do I check whether a DTS package was run or not? How do I check what the schedule'd properties are (ie. for what date, for what month, etc..)?