Finding Last Saturday Date Then Range Last 28 Days

Jul 18, 2014

In my query I have a date field and using that date field I want to pass the date to a function, or whatever is most appropriate, then compare that date with a range of the last 4 weeks, which will be numbered 1-4, 1 being earliest and 4 being latest, and then return the week number.

I've determined I need some sort of look up but will need to be dynamic - thinking maybe a temp table, first using the date the report is run on and counting 28 days back from the most recent last saturday then setting number to 1 for first 7 days then 2 for next 7 days etc.

View 8 Replies


ADVERTISEMENT

Date Range Only Including Work Days -HELP!!

May 23, 2001

I've been fighting with this for a few days now, hopefully it's a simple answer.

I need to take a daterange between two dates and output the number of work days in that range.

I wrote this but it doesn't work. I know how to write a query that tells me if a date is a word day or not but not to actually determine a date range.

SELECT in_date,out_date,DATEDIFF((weekday, in_date, out_date) in (1,2,3,4,5)) AS no_of_days
from <table>
where ikey = 'whatever'

I am in desperate need of help as my deadline is coming up soon.

View 7 Replies View Related

T-SQL (SS2K8) :: Hot To Get Number Of Days For Given Date Range

Sep 15, 2014

--From the rows I want to know how many number of days a person was active for the given date range.

create table [dbo].[personstatus]
(
id int identity(1,1),
name varchar(100),
DateAdded date,
InactivationDate date ) ;
insert into [dbo].[personstatus] values

[Code] ....

--The output I am looking for.
/*
1) FromDt = '2014-01-01' ToDt ='2014-01-30'
KRISS = 7
VDENTI = 7 days

2) FromDt = '2013-01-01' ToDt ='2014-01-01'
KRISS = 1
VDENTI = 1 days

3) FromDt = '2013-01-01' ToDt ='2014-01-01'
KRISS = 0
VDENTI = 1 days

4) FromDt = '2013-01-01' ToDt ='2014-12-31'

KRISS = 8+24+8+21 = 61 Days
VDENTI = 31+24+31+30 = 116 Days
*/

View 9 Replies View Related

Convert Date Range Into Week Days

Nov 3, 2006

Hi,

I don't know if this can be done, but hopefully one of the experts in this forum cna help me out.

I have a TimeOff table which contains 5 fields: timeoffID, employeename, startdate, enddate, and timofftype. I need to create a report which shows how many people take sick day (one of the timeofftypes) on each week day (i.e. Monday, Tuesday, Wednesday, and etc.) The problem is that I don't know how to convert the date range (from startdate to enddate) into indvidual week day for each timeoff record.

For example, on the table,

TimeoffID employeename startdate enddate timeofftype
1 Andy 11/02/2006 11/03/2006 Sick Day
2 Bill 11/03/2006 11/03/2006 Sick Day

The report needs to show:

Monday Tuesday Wednesday Thursday Friday Saturday Sunday
0 0 0 1 2 0 0


Thank you in advance!

View 4 Replies View Related

Finding Where My Date Falls In Date Range

Oct 25, 2007

Hi;

We received a Payment from a customer on '10/10/2007 10:30:00'. i am trying to calculate the commission we would receive from that payment. the commission rate can be edited. so i have to find what the commission rate was when that payment was received.


I have a CommisionAudit table that tracks changes in commission rate with the following values.

ID | Commission Change | UpdatedOn
----------------------------------------------
1 | Change from 20->25 | 03/07/2007 09:00:00
----------------------------------------------
2 | Change from 25->35 | 10/09/2007 17:00:00
----------------------------------------------
3 | Change from 35->20 | 01/10/2007 16:00:00
----------------------------------------------
4 | Change from 20->26 | 11/10/2007 10:00:00
----------------------------------------------


with this payment, as the commission rate had been changed on 01/10/2007 it would obviously be 20%(ID 3). But I need to write sql to cover all eventualities i.e. Before the first and after the last. any help would be most welcome.

View 11 Replies View Related

Finding If Any Part Of Date Range Falls In Period?

Jan 3, 2014

I'm trying to find if any part of a date range in my table between orig_start_rent and stop_rent falls within a period I specify in two variables: startPeriod and endPeriod

For example if I specify 2013-11-01 as startPeriod and 2013-11-30 as endPeriod, then if any part of the date range between orig_start_rent and stop_rent(stop-rent can be null if hire is open) falls within that period, I want that to be picked up and assigned the value of 1 in my case statement for OnHire. My code is not picking everything up however - using the example above, a record with orig_start_rent of 2013-05-23 and stop_rent of 2013-11-18 is being assigned 0 when it should be 1. My code here:

declare @startPeriod as smalldatetime
declare @endPeriod as smalldatetime
set @startPeriod = '2013-11-01'
set @endPeriod = '2013-11-30';
select dticket, orig_start_rent, stop_rent, case when orig_start_rent >= @startPeriod and orig_start_rent <= @endPeriod then 1 when orig_start_rent < @endPeriod and stop_rent is null then 1 else 0 end [OnHire] from deltickitem

View 5 Replies View Related

Getting The Saturday Before A Particular Date

Dec 19, 2007



I need to write a query that will return the saturday prior to a given date.
So, say the given date is Dec 14 2007, how can I get the date of the saturday prior (which was Dec 08 2007) ?

Thanks

View 6 Replies View Related

Get Last Day Of Week (Saturday) From Any Date?

Nov 12, 2003

Greetings,

Any tips on using datediff to get last dat of week( in this case saturday) from a date input in SQL?

Thanks for any help!

View 3 Replies View Related

SQL Server 2008 :: Query To Select Date Range From Two Tables With Same Date Range

Apr 6, 2015

I have 2 tables, one is table A which stores Resources Assign to work for a certain period. The structure is as below

Name StartDate EndDate
Tan 2015-04-01 08:30:00.000 2015-04-01 16:30:00.000
Max 2015-04-01 08:30:00.000 2015-04-01 16:30:00.000
Alan 2015-04-01 16:30:00.000 2015-04-02 00:30:00.000

The table B stores the item process time. The structure is as below

Item ProcessStartDate ProcessEndDate
V 2015-04-01 09:30:10.000 2015-04-01 09:34:45.000
Q 2015-04-01 10:39:01.000 2015-04-01 10:41:11.000
W 2015-04-01 11:44:00.000 2015-04-01 11:46:25.000
A 2015-04-01 16:40:10.000 2015-04-01 16:42:45.000
B 2015-04-01 16:43:01.000 2015-04-01 16:45:11.000
C 2015-04-01 16:47:00.000 2015-04-01 16:49:25.000

I need to select the item which process in 2015-04-01 16:40:00 and 2015-04-01 17:30:00. Beside that I need to know how many resource is assigned to process the item in that period of time. I only has the start date is 2015-04-01 16:40:00 and end date is 2015-04-01 17:30:00. How I can select the data from both tables. There is no need for JOIN, just seperate selections.

Another item process time is in 2015-04-01 10:00:00 and 2015-04-04 11:50:59.

The result expected is

Table A

Name StartDate EndDate
Alan 2015-04-01 16:30:00.000 2015-04-02 00:30:00.000

Table B

Item ProcessStartDate ProcessEndDate
A 2015-04-01 16:30:10.000 2015-04-01 16:32:45.000
B 2015-04-01 16:33:01.000 2015-04-01 16:35:11.000
C 2015-04-01 16:37:00.000 2015-04-02 16:39:25.000

Scenario 2 expected result

Table A

Name StartDate EndDate
Tan 2015-04-01 08:30:00.000 2015-04-01 16:30:00.000
Max 2015-04-01 08:30:00.000 2015-04-01 16:30:00.000

Table B

Item ProcessStartDate ProcessEndDate
Q 2015-04-01 10:39:01.000 2015-04-01 10:41:11.000
W 2015-04-01 11:44:00.000 2015-04-01 11:46:25.000

View 8 Replies View Related

Finding Number Of Days...

Oct 30, 2006

i have id, start_date, end_date

View 2 Replies View Related

Returning Records Within Days Range

Oct 31, 2013

This is a follow on from one of my earlier threads where I was trying to return one specific record. In this case I am trying to return multiple records for the same person ID and within a number of days range. Snapshot of my date with same PersonID:

PersonID Arrival_Date Leaving_Date ArrivalID
======== ============ ============ =========
123456 01/12/2012 01/12/2013 arr_56464
123456 10/12/2012 10/12/2013 arr_56474
123456 13/12/2012 13/12/2013 arr_56494

And from this I want to check if one record's leaving date of the record is within 7 days of another record's arrival date. I also want to return the record that had a leaving date within 7 days of the next arrival date.I understand that if I self join on personID with the data above I will get 9 rows, for each row I will get 3 matches, I am using INNER JOIN to join to the same table but with a different alias so I assume this is the self join I should be using.

But then how do I process this? I would want to say for record 1 check the leaving date is within 7 days of arrival date of any other record matching that PersonId but not ArrivalID, and return both records.From my snapahot of code I would eventually want to return:

PersonID Arrival_Date Leaving_Date ArrivalID
======== ============ ============ =========
123456 10/12/2012 10/12/2013 arr_56474
123456 13/12/2012 13/12/2013 arr_56494

But can't seem to get this using a self join query like this:

select a.PersonID, a.Leaving_date,a.Arrival_Date,a.arrivalID
from arrivals a INNER JOIN arrivals b
ON b.personID = a.personID
WHERE
a.arrivalid != b.arrivalid
and DATEDIFF(DD, b.[Leaving_date], a.[Arrival_Date]) <=7
and DATEDIFF(DD, b.[Leaving_date], a.[Arrival_Date]) >=0

View 4 Replies View Related

Help With Dates-finding Number Of Days Per Month

Mar 28, 2000

I am trying to determine the amount of days in a month to prorate a month end estimate.
We measure service calls and need to approximate how many we will have at month end.
I would like to automate a query to post on our web and need to know how many days are in the current month.

A possible solution would be to piece together a datetime variable using getdate and dateadd then use a datepart.
However , I don't know how to create a datetime variable this way.

Thanks in advance

View 1 Replies View Related

Finding Number Of Business Days Between Two Dates

Nov 27, 1999

Hi and Thank you in advance
I am trying to find a away to calculate the number of business days between two dates. In other word, I do not want to count Saturday nor Sundays if those days are between the two dates.
Example
if Date1 = 11/26/1999
Date2 = 11/30/1999

the DateDiff(dd,Date1,Date2) the result should be 2
I need to do this against a table which might not have a lot of records, but I also need to not count Holidays if they fall within the two Dates.
Thank you in advance
Tomas

View 1 Replies View Related

Finding Number Of Business Days Between Two Dates

Nov 27, 1999

Hi and Thank you in advance
I am trying to find a away to calculate the number of business days between two dates. In other word, I do not want to count Saturday nor Sundays if those days are between the two dates.
Example
if Date1 = 11/26/1999
Date2 = 11/30/1999

the DateDiff(dd,Date1,Date2) the result should be 2
I need to do this against a table which might not have a lot of records, but I also need to not count Holidays if they fall within the two Dates.
Thank you in advance
Tomas

View 1 Replies View Related

Query Info Between Time Range & Date Range

Aug 16, 2006

I am attempting to write a SQL query that retrieves info processed between two times (ie. 2:00 pm to 6:00 pm) during a date range (ie. 8/1/06 to 8/14/06)... I am new to SQL and am perplexed... I have referenced several texts, but have not found a solution. Even being pointed in the right direction would be greatly appreciated!!

View 6 Replies View Related

SQL Server 2008 :: Can Display All Days In A Range Even With No Data?

Aug 10, 2015

I need to display all the dates within a range even with no data

For example right now my query get the records with the range say...

The range is 7/1/15 thru 7/7/15

I Get...
Joe 7/1/15 xxx
Joe 7/3/15 ccc
Joe 7/5/15 xxx

I want...
Joe 7/1/15 xxx
Joe 7/2/15
Joe 7/3/15 ccc
Joe 7/4/15
Joe 7/5/15 xxx
Joe 7/6/15
Joe 7/7/15

View 9 Replies View Related

Analysis :: Range Function - How To Get Last 60 Days Before A Month Starts

Apr 20, 2015

I am trying to get the last 60 days before a month starts. I have a set that is returned from the query below :

SELECT
   non empty
   [Measures].[TRANSACTIONS Count] on 0,
   non empty ([TRANSACTIONS].[Days].[Days],                                                          
                                     [TRANSACTIONS].[Transaction Month].[Transaction Month])  on 1 from [cube]   

I can get the cummulative count of last 60 days before month 2 by hardcoding the day of transaction of start of month like below :

WITH MEMBER
 [Measures].[Cumm Account Count]
AS
(
    AGGREGATE( [TRANSACTIONS].[Days].CurrentMember:NULL ,[Measures].[TRANSACTIONS Count])
)

 SELECT
   non empty [Measures].[Cumm Account Count] on 0,
   non empty [TRANSACTIONS].[Days].&[3]:[TRANSACTIONS].[Days].&[3].lead(60) on 1 from  [cube];
 
and for subsequent months by using the dates that the following month starts. How can I achieve the above result without having to use the day numbers, I tried to use the tail function (to get the months and star date) but it wont work because the range function  accepts members only...

View 4 Replies View Related

Transact SQL :: Finding Unique Counts Based On Consecutive Days?

Jul 9, 2015

I have a scenario here where the data looks like -

ID        Date
100      07/01
100     07/02
100    07/03
100   08/01
100   08/02
100   08/15

Now I need to find out unique occurrences of ID - 100 ( where count = unique only if the occurrences are in consecutive days, gap of even 1 day causes it to be a different instance ) - SO with the above data I should have unique occurrences as 3.efficient way to calculate this ?

View 5 Replies View Related

Finding Highest Current Number Only For Increasing Range

Jan 26, 2012

RecordNo Speed
-------- -----
1 0
2 0
3 0
4 0
5 23
6 66
7 48
8 0
9 31
10 0
11 34
12 23

The above data shows the speed of vehicle over a time period, given the above data I need to achieve the result below:

RecordNo Speed LastAcceleration
-------- ----- ----------------
1 0 0
2 0 0
3 0 0
4 0 0
5 23 23
6 66 66
7 48 66
8 0 66
9 31 31
10 0 31
11 34 34
12 23 34

The code below is almost there but falls over on Recordno 8:

select
curr.recordno,curr.speed
,CASE WHEN curr.speed >= ISNULL(prev.speed,0) THEN curr.speed
ELSE (
SELECT MAX(speed) FROM speedtest
WHERE recordno between (CASE WHEN curr.speed >= prev.speed then curr.recordindex else prev.recordno end ) and curr.recordno

[code]...

View 4 Replies View Related

Finding Valid Identity Range On Merge Subscriber

Nov 22, 2006

I am using merge replication with automatic identity range management

I want to be able to give a disconnected subscriber a warning message if a certain percentage of the allocated subscriber identity range has been used
- so that they can make sure they reconnect soon to obtain a new identity range

I can get the current identity value OK, but I can't find a good way of finding the current permitted primary and secondary ranges

The information is available in the check constraint, but I don't really want to have to parse this!

CONSTRAINT [repl_identity_range_0DF907AC_40CF_4849_9BD0_2173C90A3805] CHECK NOT FOR REPLICATION (([ContactID]>(10000040000.)
AND [ContactID]<=(10000050000.) OR [ContactID]>(10000050000.) AND [ContactID]<=(10000060000.)))

I can't find any system view which will provide this information

Is there a recommended way of doing this?

Thanks

aero1

View 3 Replies View Related

Transact SQL :: Return Date Which Is 15 Working Days Prior To Given Future Date

Oct 28, 2015

i have written a sql function which returns only number of working days (excludes holidays and Weekends)  between given StartDate  and EndDate.
                 
USE [XXX]
GO
/****** Object:  UserDefinedFunction [dbo].[CalculateNumberOFWorkDays]    Script Date: 10/28/2015 10:20:25 AM ******/
SET ANSI_NULLS ON
GO

[code]...

I need  a function or stored procedure which will return the date which is 15 working days (should exclude holidays and Weekends) prior to the given future Date? the future date should be passed as a parameter to this function or stored procedure to return the date.  Example scenario:  If i give date as  12/01/2015, my function or stored procedure should return the date which is 15 working days (should exclude holidays and Weekends) prior to the given date i.e 12/01/2015...In my application i have a table  tblMasHolidayList where all the 2015 year holidays dates and info are stored.

View 18 Replies View Related

SQL Server 2012 :: Calculate Number Of Days Based On Computer System Date And Due Date Row

Mar 18, 2014

I have a query to run a report where the results has a column named “Due Date” which holds a date value based on the project submission date.Now, I need to add 4 columns named, “45 Days Expectant”, “30 Days Overdue”, “60 Days Overdue” and “90 Days Overdue”.I need to do a calculation based on the “Due Date” and “System (I mean default computer date) Date” that if “System Date” is 45 days+ to “Due Date” than put “Yes” in “45 Days Expectant” row.

Also, if “Due Date” is less than or equal to system date by 30 days, put “Yes” in “30 Days Overdue” and same for the 60 and 90 days.how to write this Case Statement? I have some answers how to do it in SSRS (Report Designer) but I want to get the results using T-SQl.

View 2 Replies View Related

Need To CalcuThe Number Of Days Between The Current Date And A Stored Date

Sep 22, 2006

I need help with creating a query that compares the current date with a stored date field. If the difference between the two dates is greater or equal to 5 days for example, I need to be able to return these records. I am not sure if this can be done through a query alone but any help and suggestions would greatly be appreciated. Thanks in advance.

View 4 Replies View Related

SQL Server 2008 :: Finding Beginning Date From Multiple Lines Of Date Ranges?

Mar 20, 2015

I am trying to find a beginning date from multiple date ranges, for example:

RowNumberidBegin dtEnd Dt
107933192014-09-022015-06-30
207933192013-09-032014-09-01
307933192012-09-042013-09-02
407933192011-09-062012-09-03

For this id: 0793319, my beginning date is 2011-09-06

108203492014-09-022015-06-30
208203492013-09-032014-09-01
308203492012-09-042013-09-02
408203492011-12-122012-07-03--not a continuous date range

For this id: 0793319, my beginning date is 2012-09-04

108203492014-09-022015-06-30

For this id: 0820349, my beginning date is 2014-09-02

To find continuous date, you look at the beginning date in row 1 and end date in row 2, then if no break in dates, row 2 beginning date to row 3 end date, if no break continue until last date There could multiple dates up to 12 which I have to check for "no break" in dates, if break, display beginning date of last continuous date.

View 9 Replies View Related

SQL 2012 :: Use Date Trunc Or Date Function To Select Date Range For Month On Month View

Jul 29, 2015

My goal is to select values from the same date range for a month on month view to compare values month over month. I've tried using the date trunc function but I'm not sure what the best way to attack this is. My thoughts are I need to somehow select first day of every month + interval 'x days' (but I don't know the syntax).In other words, I want to see

Select
Jan 1- 23rd
feb 1-23rd
march 1-23rd
april 1-23rd
,value
from
table

View 9 Replies View Related

Reporting Services :: Date Range Filter Based On Date Values Returned In Report?

Aug 27, 2015

I have a QA Deployment Date field that is being returned in a custom report I created. I also found a sample date range parameter:

What I want to accomplish:

I want to select a From and To Date and filter the report to only display the rows that have the QA Deployment Date within the selected range.

For example.. I want to select From Date (8/1/2105) and To Date (8/31/2015) and I only want to return only the results that have a QA Deployment date between that selected range.

View 3 Replies View Related

Date Parameter In SSRS - Allow Drop Down For A Date Range To Be Selected

Aug 11, 2013

Date parameter. I created a report that allows a drop down for a date range to be selected. However, whenever I preview the report, I get an error. I know my error stems from my date fields being in this format "201301" , and the "date/ time" in SSRS being mm/dd/yyyy on the drop down calendar in SSRS.

I know the direction I want to go in, but just a little confused on where would I use the convert or cast function. Would it be in the data parameter itself, or a part of the query before the @start date and @End date?

View 18 Replies View Related

Reporting Services :: Searching By Single Date Or Date Range

Apr 22, 2015

I would like to be able to search by a single date, @StartDate, or by a date range , between @StartDate and @EndDate. I am having a hard time with the logic on this for a report in SSRS.

View 5 Replies View Related

How To Get Latest Temperature Reading For Each Date In A Date Range

Sep 28, 2012

I have to display the last temperature reading from an activity table for all the dates in a selected date range.So if I select the date range from 09/01/2012 to 09/30/2012, the results should look like this:

Date Temperature
09/01/2012 73.5
09/02/2012 75.2
09/03/2012 76.3
09/04/2012 73.3
09/05/2012 77.0
09/06/2012 74.5
and so on.

I am using this to get the dates listed:
WITH CTE_DatesTable
AS
(
SELECT CAST('20120901' as date) AS [Date]
UNION ALL
SELECT DATEADD(dd, 1, [Date])
FROM CTE_DatesTable
WHERE DATEADD(dd, 1, [Date]) <= '20120930'
)
SELECT [Date]
FROM CTE_DatesTable

How could I get the temperature if I did a sub-query here?

View 5 Replies View Related

{RESOLVED} Date Logic - Calculating A Date Range

Jan 23, 2007

I have a report that I need to run on 2 different date ranges.

Both report's data is 2 days behind today's date.
so...
WHERE reportdate between dateadd('d',date(),-2) and dateadd('d',date(),-2)
OR SOMETHING LIKE THAT, NO BIGGIE HERE

The 2nd report is a month to date report. This is the 1 I can't figure out.
WHERE reportdate between (the first day of this month) and dateadd('d',date(),-2)

So that would look like
WHERE reportdate between 1/1/2007 and 1/21/2007

My problem is, if today is the 1st day of the month... how can I get my critiera to NOT do this
WHERE reportdaye between 2/1/2007 and 1/30/2007

Any help would be greatly appriciated!

View 2 Replies View Related

Query Help - Giving A Date Range Given The Start Date, Thanks!

Jul 23, 2005

Hi Group!I am struggling with a problem of giving a date range given the startdate.Here is my example, I would need to get all the accounts opened betweeneach month end and the first 5 days of the next month. For example, inthe table created below, I would need accounts opened between'5/31/2005' and '6/05/2005'. And my query is not working. Can anyonehelp me out? Thanks a lot!create table a(person_id int,account int,open_date smalldatetime)insert into a values(1,100001,'5/31/2005')insert into a values(1,200001,'5/31/2005')insert into a values(2,100002,'6/02/2005')insert into a values(3,100003,'6/02/2005')insert into a values(4,100004,'4/30/2004')insert into a values(4,200002,'4/30/2004')--my query--Select *[color=blue]>From a[/color]Where open_date between '5/31/2005' and ('5/31/2005'+5)

View 2 Replies View Related

Date Picker Controls - Anyway To Limit Date Range

Jul 26, 2007

Have seen other questions here about modifying date pickers supplied by reports created in BIDS. The answer is usually NO. But this does not involve a format change, simply want to limit say to a specific year.
Any ideas?

View 4 Replies View Related

Finding Most Recent Date From Current Date?

Oct 21, 2013

the requirements are to return person ID with the most recent leaving date from a scheduled dept, who has previously arrived at an unscheduled dept within 7 days, but just now my query shows all the previous leaving dates within 7 days of that unscheduled dept arrival, I only want the last leaving date before the arrival at the unscheduled dept:

So for instance looking at a copy of one person's date below I have:

PersonID Last Dept Arrival Date To Last Dept Leaving Date From Last Dept Next Arrival Date to Unscheduled Dept
======== ================= ========================= =========================== =====================================
0106573268Dept 5 2013-03-01 2013-03-03 2013-03-05
0106573268Dept 6 2013-02-27 2013-02-27 2013-03-05
0106573268dept 2 2013-02-26 2013-02-26 2013-03-05

In the data above I only want to return the first row, which is the most recent leaving date before arrival at an unscheduled dept.

My query is much the same as before except my inline view is looking at the data for last scheduled leaves from depts in my inline view and also the outer query returning all arrivals to the unscheduled dept:

SELECT b.personID
,b.dept AS "Last leaving dept"
,b.arrival_Date as "arrival Date To Last dept"
,b.leaving_Date AS "leaving Date From Last dept",
a.[arrival Date] as "Next arrival Date to AREA_GH"
FROM Unscheduled_Arrival a INNER JOIN (SELECT *
FROM scheduled_Leaves
where [leaving date] is not null) b
ON a.Person_ID = b.Person_ID

[code]....

View 11 Replies View Related